SSA Outsourcing Contract of Employment Proforma Download

SSA Outsourcing/Contract of Employment Proforma Download and Details: MIS Coordinators(MISCOs), Data Entry Operators(DEOs), Cluster Resource Persons(CRPs), Divisional Level Monitoring Teams (DLMTs) and Asst Sectoral Officers ASOs(NGO) on contract basis/out sourcing to work. As per SSA AP Rc.1707, MIS Coordinators(MISCOs), Data Entry Operators(DEOs), Cluster Resource Persons(CRPs), Divisional Level Monitoring Teams (DLMTs) and Asst Sectoral Officers ASOs(NGO) on contract basis/out sourcing to work from 01.05.2021 till the end of the academic year 2021-22 in DPOs, Divisional, Mandal, School Complex and School level in the districts duly assessing the performance. CONTRACT  OF EMPLOYMENT This Employment Contract is entered into this the——day of ——-(Month) 2021 (Year) By and Between: Project Officer/MEO/HM, School Complex——————————— represented by ——————————–district (hereinafter referred to as the “Employer” which expression shall unless excluded by or repugnant to the context or meaning thereof include its successors and assigns) of the ONE PART. ANDSri/Smt./Kum—– an Indian resident, residing at———–(hereinafter referred to as

Rc.1575 TSSA Conduct of OSC CwSN Samagra Kutumba Survey by IERPs

TSSA Conduct of OSC CwSN Samagra Kutumba Survey, The Director  of Schools Education and State Project Director Sarva Shiksha Abhiyan (SSA), Telangana State, Hyderabad has issued proceedings rc.1575 on June 8th, 2015 for conducting OSC (CwSN) Samagra Kutumba Survey and for running IERCs for the year 2015-16 and certain guidelines have been issued for conducting OSC Survey and also instructions have been issued for run IERCs. Proceedings.Rc.No.1575/TSSAAE/T8/2015,Dated: 08.06.2015 Subject: TSSA, Hyderabad -IE Wing – Certain instructions for conducting OSC (CwSN) Samagra Kutumba Survey and for running IERCs for the year 2015-16 – Reg. TSSA Conduct of OSC CwSN Samagra Kutumba Survey With reference to the subject cited, all the District Project Officers are hereby informed that for the year 2015-16, Telangana State has identified 73,226 CwSN, which is 1.64% of total. child population, however in census 2011 it was mentioned there were above 1,32,710. In this regard it is decided

TSSA Instructions to Run IERCs, Instructions for Running Telangana IERCs

TSSA Instructions to Run IERCs: All IERCs should be within or in proximity to main school. IERCs which do not have own buildings should be placed in a school which can spare minimum 2 rooms for running IERC, preferably located at mandal HQ or in the village where more number of CwSN could easily be accessed. Only mild and moderately disabled children should be admitted in IERC and severe /profound children to be dealt under Home Based Education. Children identified for IERCs as a mandated should be enrolled in the nearby school and then to admit in the IERC for a short period as planned in Individualized Education Plan (IEP). They should have a plan to mainstream the CwSN of IERC into are regular school. Supply of Uniforms and Mid-meal is mandatory to all children attending IERC. Physiotherapy camps to be conducted on a fixed day of the week so

TS SSA MRC Grants Utilization Guidelines 2022

TS SSA MRC Grants Utilization Guidelines, Sarva Shiksha Abhiyan, Telangana, Hyderabad has given Guidelines on the utilization of MRC Grants 2016-2017. The following guidelines are issued for the utilization of various grants that are Mandal Resource Center Grants to be released under Sarva Shiksha Abhiyan. MRC Grants Utilization Guidelines: Guidelines on the utilization of MRC Grants: PROCEEDINGS OF THE COMMISSIONER AND DIRECTOR OF SCHOOL EDUCATION & EX-OFFICIO PROJECT DIRECTOR, TSSA, HYDERABAD, Rc.No.1835/TSSA/Plg/T7/2014, Dated:/0.02-2017 Subject: Sarva Shiksha Abhiyan, Hyderabad – Planning & MIS – Release of MRC Grant to 467 Mandal Resource Centers in the State – Guidelines communicated – Reg. Reference: This office Proc.Rc.No.even, Dt:l0.01.2017 and 28.01.2017 All the District Educational Officers & Ex-officio District Project Officers in the State are informed that MRC grants are released to 467 MRCs in two installments i.e., Rs.20,000/- (1st installment) and Rs.30,000/- (2nd installment) for the year 2016-17 vide references cited above. The detailed

TSSA Cluster Resource Person Job Chart for CRPs

TSSA Cluster Resource Persons New Job Chart, TSSA Telangana Sarva Shiksha Abhiyan Warangal CRP’s Job Chart, Cluster Resource Person’s, Revised Job Chart Guidelines for implementation. As per note orders of the District Collector, Project Officer of the Warangal SSA has issued a memo 135302 on December 3, 2014 for implementation of revised Job Chart Guidelines and Certain Instructions. Attention of All the Mandal Educational Officers in the District is invited to the reference cited, wherein the District Collector & Chairman TSSA, Warangal has instructed to revise the job chart of CRPs by including conducting of Swachh Bharath and supervision of AWC. Hence all the Mandal Educational Officers are requested to instruct all the school complex head masters to implement the job chart scrupulously see that and tentative tour programme of all the CRP’should be submitted by 25th of every month and submit the attendance and work done report to this

TSSA Instructions for Implementation of Rashtriya Avishkar Bhavan (RAA)

Implementation of Rashtriya Avishkar Bhavan: SSA Telangana- Proc. Rc.No.2740/SSA/T6/2015, Dated:04 .07.2016: Sub: SSA, Telangana State, Hyderabad – Pedagogy Wing -Communication of guidelines to DEOs, POs of SSA and Principals of DIETs to select 5% of Primary and Upper Primary Schools in the districts to continue the implementation of Rashtriya Avishkar Bhavan (RAA) – Reg. All the District Educational Officers, Project Officers of SSA and the Principals of DIETs / CTEs in the state are informed that MHRD has launched Rashtriya Avishkar Abhiyan (RAA) throughout the country in primary to higher secondary schools (6-18 years age group) in pursuance of the focus on connecting school based knowledge to life outside the school making learning of science, mathematics a joyful meaningful activity and to bring focus on innovation and use of technology. In this regard RAA brochure and guidelines were sent to all districts in the month of August, 2015. RAA brochure

RC.No. 660 Remuneration Enhanced to RVM Outsourcing/Contract Staff

Remuneration Enhanced to RVM Outsourcing/Contract Staff, Sate Project Director, Rajiv Vidya Mission (SSA), Hyderabad has issued Proceedings Rc.No.660 on May 30, 2014. In this regard more number of various categories of personnel are engaged on outsourcing /contract basis based on needs than approved in the PAB 2014-15. More number of persons will be engaged for effective monitoring from management cost. As such, remuneration to personnel working on outsourcing / contract basis in the District Project Offices, Mandal Resource Centers and School Complexes in the state is enhanced with effect from 01.06.2014. PROCEEDINGS OF THE STATE PROJECT DIRECTOR, RAJIV VIDYA MISSION (SSA) ANDHRA PRADESH – HYDERABAD. Rc.No.660/RVM(SSA}C2/2013; Dated: 30-05-2014 Sub: RVM (SSA) A.P, Hyderabad -Remuneration to the personnel working on outsourcing/contract basis in the District Project Offices, Mandal Resource Centers and School Complexes in the state with effect from 01.06.2014 – Orders – Issued – Reg. Ref: PAB minutes of AVVP&B

SSA Teachers TLM Grants Utilization Guidelines

SSA Teachers TLM Grants Utilization guidelines, Suggested Websites for e- Material,E-Learning Material, Suggestive TLM Material for Primary Level, Upper primary level, Utilization of Teaching Learning Material Grant for Language Kit, Mathematics Kit, EVS Kit, Science TLM, Maths TLM, Social TLM, Biology TLM. Rc.No.2191, Dated:24-10-2017 Teachers Grant Released for 2017-2018, Teachers Grant Utilization guidelines Teachers Grant Utilization guidelines:Telangana Sarva Shiksha Abhiyan, Hyderabad Guidelines on the utilization of Teachers Grants 2017 – 18. The following guidelines are issued for the utilization of Teacher Grants @ Rs. 500/- per teacher per annum) released under Sarva Shiksha Abhiyan during 2017-18. Provision: The teachers working in the schools under Government, Local body, Tribal Welfare (ITDA), Social Welfare, TSRIES, TSSWRIES, TSTWRIES, Disabled Welfare, and Aided Managements will be released teacher grant 0 Ra.500/- per teacher per annum. SSA Teachers TLM Grants Utilization Guidelines: 1. 50% of the grant to be utilized for temporary TLM and 50% for permanent TLM.2.

Instructions for Reconciliation of TSSA Grants

Instructions for Reconciliation of TSSA grants, School grant, Maintenance grant, Staff salaries releasing. School grant, Maintenance grant Utilization guidelines. Norms for Utilization of School Grant and Maintenance Grants/Funds. PROCEEDINGS OF THE DISTRICT EDUCATIONAL OFFICER, MAHABUBABADProc. Rc. No. 1320/SSA/B4/2016 Date: 06.01.2017Sub: SSA, Mahabubabad – Reconciliation of School grant, Maintenance grant and Staff salaries released by the State Project Director, TS, Hyderabad – Instructions issued – Reg. Ref:1. Mail received from the Ex-Officio, SPD, TS, Hyderabad, Dt; 27.12.2016.2. School grant, Maintenance grant and staff salaries released by the SPD, TS, Hyderabad. In the reference 1st cited, the State Project Director, TS, Hyderabad has instructed to reconcile the amounts released by the State Project Office directly to the bank accounts and submit the reconciliation statements immediately (list of grants released is enclosed).Instructions for Reconciliation of TSSA Grants. In view of the above, while enclosing the proformas of reconciliation, all the Mandal Educational Officers

Rc.1335 Collection of Aadhar Numbers to enable the updation of website

Collection of Aadhar Numbers: TS SSA State Project Director has given proceedings rc.no.1335 to all the Project Officers and District Educational Officers in the state for Collection of Aadhar Number to enable the updation of website and certain instructions have been issued. Rc.No.1335/TSSA/Plg./T7/14.; Dated:04-07-2015 Subject: TSSA, Hyderabad – Collection of Aadhar Number to enable the updation of the website – Certain instructions issued – Reg. Reference: This office Proc.Rc.No.even, Dt: 02.07.2015 All the Project Officers and District Educational Officers are informed that the NIC has requested to stop the updation of child info with Aadhar number for a period of two weeks’ for maintenance. Therefore, they are requested to issue instructions to MEOs / HM / MIS Coordinators /CRPs to collect the Aadhar number of each student during this period of two weeks. This exercise of collection of Aadhar numbers within two weeks will help the data uploading online without

Implementation of Quality Monitoring Tools QMT

Implementation of Quality Monitoring Tools QMT, Sarva Shiksha Abhiyan (SSA) is the flagship program of the Government of India which aims at providing quality elementary education to all children in the age group of 6 to 14 years. The National Curriculum Framework, 2005 also emphasizes the need for improvement in the quality of education. In the context of elementary education following quality, dimensions have been identified. Quality Dimensions of Elementary Education1. Basic Infrastructure and other Facilities2. Management and Community Support3. School and Classroom Environment4. Curriculum and Teaching Learning Material5. Teacher and Teacher Preparation6. Opportunity Time (Teaching-Learning Time)7. Classroom Practices and Processes8. Learners’ Assessment, Monitoring, and Supervision With a view to managing the quality of elementary education under SSA, the MHRD through NCERT put in place a massive program of monitoring quality dimensions of elementary education throughout the country during 2005-06. The Department of Elementary Education, NCERT in consultation with States/ UTs,

TSSA Video Conference and Discussing Agenda Items

TSSA Video Conference and Discussing Agenda Items, Stipend Disbursement, NSIGSE, Kala Utsav 2016, Aadhar-Child Info, GIS Mapping, HMs- Teachers SMS application, Village Education Register/VER, Badi Bat program, Special Enrollment Drive. Discussion items for Video Conference for DEOs on 28-11-2017 and 29-11-2017. Agenda items for Video ConferenceAgenda items for Video Conference with R Ws, DEOs, MEOs on 06-01-2018 from 3.00 P.M to 5.00 P.M. Conduct of SSC Examinations. Action plan for improvement of results / basic facilities in centers. 2.Admissions in Schools with CBSE / ICSE / IB / Cambridge syllabus as per Government Schedule Status quo as Collection of Fee for next academic year – 2018-19. Distribution of Kits in KGBVs, Model School (Hostels) / TREIS Schools. Suspensions & transfers to nearest places – deviation of transfer policy. Payment of cooking cost and honorarium up to date. Progress of construction of kitchen-cum-stores. MIS Data Entry up to December 2017 by 10-01-2018.

TSSA Instructions for Implementation of RAA Rashtriya Avishkar Abhiyan

TSSA Instructions for Implementation of RAA Rashtriya Avishkar Abhiyan: SSA Telangana Proc. Rc.No.2740/SSA/T6/2015,Dated: 04 .07.2016: Sub: SSA, Telangana State, Hyderabad – Pedagogy Wing -Communication of guidelines to DEOs, POs of SSA and Principals of DIETs to select 5% of Primary and Upper Primary Schools in the districts to continue the implementation of Rashtriya Avishkar Abhiyan (RAA) – Reg. All the District Educational Officers, Project Officers of SSA and the Principals of DIETs / CTEs in the state are informed that MHRD has launched Rashtriya Avishkar Abhiyan (RAA) throughout the country in primary to higher secondary schools (6-18 years age group) in pursuance of the focus on connecting school-based knowledge to live outside the school making learning of science, mathematics a joyful meaningful activity and to bring focus on innovation and use of technology. In this regard, the RAA brochure and guidelines were sent to all districts in the month of

TSSA Out of School CwSN Survey Guidelines – OSC Samagra Kutumba Survey Form

TSSA Out of School CwSN Survey Guidelines, Telangana Sarva Siksha Abhiyan is implementing several interventions for Children with Special Needs. The Telangana state has identified 73226 CwSN, out of a total child population of 4467982, which is 1.64% of the total children; however in census 2011 it was recorded as 1,32,710 CwSN. In this regard, the Ministry of HRD has advised about the need for reassessment of these numbers. Hence, it has been decided to verify the most popular and pragmatic data of Samagra Kutumba Survey (SKS) which will be more accurate to reach the unreached. As part of this survey, Inclusive Education Resource Person will visit all the habitations in their respective mandals to verify the CwSN data of Samagra Kutumba Survey(SKS) and check whether any CwSN is left out without getting services from SSA i.e. enrolment in school/IERC, Home Based Education, Support of Aids and Appliance, corrective surgeries

TS SSA School Annual Grant Utilization Guidelines

TS SSA School Annual Grant Utilization Guidelines: TSSSA Grants for TS Schools, SSA Grants for Telangana Schools, Grants Utilization Guidelines, School Annual Grant, Maintenance Grant  Sarva Shiksha Abhiyan, Telangana, Hyderabad Guidelines on the utilization of Grants 2020-2021 School Annual Grant and Maintenance Grants will be released every year by the Telangana State Sarva Shiksha Abhiyan and in this subject guidelines have been issued for utilization of  grants. This year School Grants and Maintenance grant will be released for this year. The following guidelines are issued for utilization of various grants that is school grant and maintenance grants will be released under Sarva Shiksha Abhiyan during 2015-2016. I. School Grant Each Primary School: Rs. 5,000/- Upper Primary School: Rs. 12,000/- UP Sections of High School: Rs. 7000/- A. Provision: The schools functioning under Government, Local Body, MPP, ZPP, Tribal Welfare (ITDA), Social Welfare, APRIES, APSWRIES, APTWRIES, Disabled Welfare, and Aided Management